Reference Number NIA_WPD_024
Title Time Series Data Tool Feasibility Study
Status Completed
Energy Categories Other Power and Storage Technologies(Electricity transmission and distribution) 100%;
Research Types Applied Research and Development 100%
Science and Technology Fields PHYSICAL SCIENCES AND MATHEMATICS (Applied Mathematics) 100%
UKERC Cross Cutting Characterisation Not Cross-cutting 100%
Principal Investigator Project Contact
No email address given
Western Power Distribution
Award Type Network Innovation Allowance
Funding Source Ofgem
Start Date 01 October 2016
End Date 01 May 2017
Duration 7 months
Total Grant Value £95,576
Industrial Sectors Power
Region South West
Programme Network Innovation Allowance
 
Investigators Principal Investigator Project Contact , Western Power Distribution (100.000%)
Web Site http://www.smarternetworks.org/project/NIA_WPD_024
Objectives The objective of the project is to establish the DNOs present and future requirements for the storage, analysis and interrogation of SCADA time series data together with its associated developed cost. The Project includes the following main identifiable steps which can be assessed for completeness and an indication of successful conclusion: Requirements gathering, user interaction allowing processing to next step; Requirements specification - production of a complete specification against which the existing market can be compared and potential suppliers may quote; Tender process resulting in identifiable solutions and costs; Selection of a preferred solution; Follow on instructions / details for following implementation project. The progression to the next stage is predicated on the success of the previous steps in each case, so the ability to follow on in this way is a key measure of ongoing success. A final identified solution outcome is the ultimate measure of Project completeness and success.
Abstract

It is a fundamental requirement for the DNO transition towards DSO that there is a greater understanding and visibility of the historic and real-time energy flows, as well as a much more complete data capability as technology moves towards a cloud based ‘Internet of Things’. Holistic, big picture views are necessary to knit together the right data repositories in optimal fashion and establish a flexible foundation for the future, with the highest value data readily accessible to the right user.

This research project will seek to answer three questions;

  1. What time series data requirements does the DNO have for a DSO future ? This question includes raw data, visualisation and processing requirements together with functionality questions such as the requirement for smartphone apps or centralised vs. decentralised data repositories.
  2. What time series data analysis tools and visualisation technologies are currently available and how do they compare to our current and future requirements ?
  3. What would be the cost to develop a tool satisfying these identified requirements ?

The project will form three distinct work packages in order meet the objectives as set out in this document;

Work Package 1 - Production of a requirements specification for a new time series database based on research including learnings from Time Series Data Quality project together with internal business input and wider DNO input.

Work Package 2 - Review of the current solutions and technologies available and how they compare against our identified anticipated requirements.

Work Package 3 - Tender process for a time series database and integrated analysis tool. Costs from this will then inform a subsequent time series database development project.

Note : Project Documents may be available via the ENA Smarter Networks Portal using the Website link above

Publications (none)
Final Report (none)
Added to Database 17/12/18